Compass RestorationLudlow, MA +1 (945) 392-7618 Leave a number
Cedar-shingle colonial roof during restoration work in Massachusetts
Opened bays stay open until the wood is quietHow Compass writes a ticket
Restoration · Ludlow

Wet rooms in Ludlow get a bearing, then a rebuild

COMPASS RESTORATION SERVICES, LLC opens the damaged bay, dries the wood, and hangs the rooms back from 563 Center St — Victor Rodrigues still walks the joists himself.

Shop photos

Tarps come off Center Street first

We shoot the bays we actually closed — not stock rooms from another town.

Rebuilt living room with new drywall and oak floor
Living room after the last coat of primer
Massachusetts colonial with modest restoration scaffolding
Gable work on a quiet Ludlow street
What we rebuild

Rooms Compass puts back after the water

Moisture first. Finish second. The order does not flip for a faster invoice.

Lead trade

Water & rebuild

We open the wet wall, run the meters, and only close the bay when the wood is quiet again.

Kitchen & bath stacks

Cabinets, tile, and the wet subfloor that usually hides under both.

Storm & ice-dam rooms

Ceilings that sag after a freeze, sheathed again from Center Street.

Finish after dry-out

Paint, trim, and flooring once the hygrometer stops arguing with us.

Owner on the joists
Victor still knocks the wet plaster himself
Victor Rodrigues checking joists
Victor RodriguesOwner · Center Street shop

COMPASS RESTORATION SERVICES, LLC works residential remodelers’ work — water, storm, and the rooms that have to come back after. The shop sits at 563 Center St in Ludlow. Victor still takes the first walk.

We do not paint over a brown ring and call the house finished. If the bay is wet, we say so on the ticket.

Ticket notes

Bays this shop typically opens

Kitchen

Center Street supply line

Opened two bays, dried the subfloor, reset the cabinets that still had square corners.

Bath

Stack that ran overnight

Pulled the wet board, dried the joists, hung a new pan — no vinyl over the stain.

Gable

Ice dam on the north pitch

Sheathed the wet ceiling, waited on the meter, then primed so the next freeze has less to eat.

How we bill the bay

Open first, finish second — how we phase a Ludlow ticket

Phase one — dry

Meters, demo, fans. We stop when the wood is quiet, not when a round number looks tidy.

Phase two — hang

Board, cabinets, trim. Finish is quoted after the bay is dry so the number matches the house.

The shop

Victor and the Center Street crew

Victor Rodrigues Owner — first walk on every wet bay

The crew is small on purpose. Tickets still leave Center Street with his name on them.

Leave the digits. Victor rings from Center Street.

Type a phone. The page thanks you here — then the shop calls back.